Four ready-to-develop lots feature Sewer and Water Taps already paid for and in place for immediate use. These lots are fully retained with concrete walls, and construction-ready pads have been meticulously prepared. Two Department of Transportation (DOT) Curb Cuts off A1A are already in existence.